France to close the RN20 for several weeks in autumn 2027

The operation will remove a rock mass of up to 400 cubic metres, while authorities consider partial closures and alternating traffic

SFGA/CEsteve
SFGA/CEsteve
by La Veu Lliure
2 min read
Published on Friday, 9 October 2026 - 17:13

France is planning to close the RN20 for several weeks between late summer and early autumn 2027. The operation will involve the preventive removal of a rock mass measuring between 350 and 400 cubic metres, located next to the railway line connecting France and Andorra.

The exact date has not yet been set and will be agreed with the Andorran authorities. The aim is to carry out the works after the summer season and before Christmas, in order to reduce disruption and avoid periods of peak tourist activity.

The rock is currently considered stable, but experts believe it could become unstable in the coming years. For this reason, France is planning a preventive blasting operation to remove the rock before it poses a risk to the road or railway line.

The proximity of the railway tracks makes the operation particularly complex. The works will have to be carefully planned to prevent rocks from falling onto the railway infrastructure during the blast.

Three options under consideration

French authorities are studying different ways of organising the restrictions. The options include a full and continuous closure of the road, traffic restrictions limited to Monday to Friday, or an alternating traffic system.

The Andorran Government and France will work together to minimise the impact. A technical committee will begin studying the alternatives in the coming weeks. 

Andorran Prime Minister Xavier Espot has nevertheless warned that it will be very difficult to avoid some form of closure, given the large scale of the works.

The prefect of Occitania, Pierre Fabrice Rigoulet-Roze, has also acknowledged that closing the RN20 is the most likely scenario. He explained that, for safety reasons, it will be necessary to intervene in the area and carry out major works lasting several weeks.

The road remains open

For the time being, the RN20 remains open and the rock has not moved. The area is equipped with an early-warning system capable of detecting any movement and stopping traffic if necessary.

As an alternative during the future closure, France is considering increasing the frequency of railway services. French and Andorran authorities will continue negotiating the details of the operation and the final timetable over the coming months.

 

Add new comment

HTML Restringido

  • Allowed HTML tags: <a href hreflang> <em> <strong> <cite> <blockquote cite> <code> <ul type> <ol start type> <li> <dl> <dt> <dd> <h2 id> <h3 id> <h4 id> <h5 id> <h6 id>
  • Lines and paragraphs break automatically.
  • Web page addresses and email addresses turn into links automatically.
CAPTCHA

Related news